A Blonde in Love Recreation Project - Recording Plan

A Blonde in Love Recording Plan

Today, 15th Sep, the group and I discussed our plans for recording, we had previously already planned to record shots today. So we went on to record the shots to be taken in a shot list that we would tick off after we had acquired each of the shots. This will come in handy as we can shoot out of shot order yet record what we already have. 

We also needed to sort out the equipment that would need to be used and booked out. Luckily one of our team has and brought in his own equipment so for this we wouldn't need to complete an order form. The equipment he has for us as a team is a Camera, Mono-pod and Memory Card. The lighting is not much hassle as for most new wave production it is using the natural lighting of the location. The same goes into the planning of the sound as it would be the natural sound of the places. We would have to consider when using the natural lighting and sound the effect of the ambient influences such as the sun being brighter in some shots, causing continuity problems, or if there are loud traffic noises that would interfere with the take.

We decided we would have roles in our team but blur the lines so as we could cover all the bases needed to get the footage. James will be camera man, I will be in control of the shots and the shot list, Insert name here will be in charge of locations. We all will be doing our own edit with the shots taken and we all will be working together to direct and act in the piece too.

No comments:

Post a Comment